ninja-forms
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/emirresea/public_html/wp-includes/functions.php on line 6114wp-user-avatar
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/emirresea/public_html/wp-includes/functions.php on line 6114really-simple-ssl
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/emirresea/public_html/wp-includes/functions.php on line 6114sgg
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/emirresea/public_html/wp-includes/functions.php on line 6114google-analytics-for-wordpress
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/emirresea/public_html/wp-includes/functions.php on line 6114wordpress-seo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/emirresea/public_html/wp-includes/functions.php on line 6114Published in The Malaysia Insight<\/a>, Astro Awani<\/a> and theSundaily<\/a>, image by theSundaily<\/a><\/em>.<\/p>\n\n\n\n The commitment from the Sabah state government to upgrade the existing 4G coverage by this year as well as install 5G networks as planned for under the 12th<\/sup> Malaysia Plan from 2023 to 2025 is encouraging news indeed \u2013 and harbinger of the next stage of development by enabling Sabahans to enjoy access to better digital infrastructure in the near future.\u00a0<\/p>\n\n\n\n However, till today, Sabahans still face enormous challenges in enjoying better access to basic infrastructure ranging from water, electricity, well-paved roads to health and education facilities. <\/p>\n\n\n\n For instance, the recent water shortages at the Kota Kinabalu Industrial Park (KKIP) were relatively unexpected among the factory owners. They had to incur an additional cost by purchasing treated water supplies daily to continue their manufacturing operations. <\/p>\n\n\n\n Increased frequency of extreme weather patterns and events caused by climate change also led to more heavy rainfalls in Sabah. Excessive rains eventually resulted in more frequent flash floods in the west coast of Sabah (including Kota Belud, Kota Kinabalu, Papar, Beaufort, Sipitang and Bongawan), in particular. Many residents staying in flood-prone areas often experience constant power disruptions due to mud damaged electrical and home appliances. <\/p>\n\n\n\n As such, residents who were left with flood-damaged houses, vehicles, furniture and electrical appliances struggle to endure the double whammy of the on-going Covid-19 crisis affecting livelihoods and flood disasters. <\/p>\n\n\n\n On Sabah\u2019s east coast districts, particularly larger districts such as Sandakan and Tawau, people are still generating electricity from power generators based in the west coast. Despite those in Sandakan and Tawau not experiencing blackouts often compared to a decade ago (i.e., once every two weeks), they still experience power disruption about once every three months. <\/p>\n\n\n\n Although a total of 892.2km of rural roads in Sabah were constructed and upgraded in the 2016-2020 period, only 52% of the 15 work packages for the Pan Borneo Highway Sabah project have been completed. According to Prime Minister Dato\u2019 Sri Ismail Sabri Yaakob\u2019s statement on March 4, 2022, the first-phase of works on the Pan Borneo Highway Sabah project is expected to be completed by October 2024. <\/p>\n\n\n\n In addition, Sabah has the smallest distribution of doctors compared with the Peninsula and Sarawak. In 2020, Sabah\u2019s official ratio of doctors to the population was 1:872, lower than the national average of 1:441. Lack of medical specialists and amenities has tremendously raised the costs of healthcare among rural patients especially. <\/p>\n\n\n\n This is set against the deplorable pre-existing backdrop of rural residents often times having to drive on muddy, rut-imprinted, uneven roads or otherwise travel by boat to seek treatment in a public hospital located beyond the 5km radius from their living area. <\/p>\n\n\n\n Limited access to digital devices has also prevented some rural students from using online learning materials. Even before online learning became an issue, face-to-face learning was a recurrent problem too. Dilapidated schools are certainly not conducive to effective teaching and learning environments. <\/p>\n\n\n\n According to the Deputy Minister of Education II Datuk Mohamad Alamin, 31 out of 270 dilapidated school projects in Sabah were approved for upgrading between 2016 and 2020. Nevertheless, land issues have prevented the upgrading work to start or be completed. <\/p>\n\n\n\n For now, the Public Works Department (JKR) requires six acres of land for the construction of a primary school and 10 acres for a secondary school. However, some of the land parcels were too small, thus preventing the upgrading work for the dilapidated schools in Sabah to complete within the expected timeline. <\/p>\n\n\n\n Due to a limited number of Comprehensive Special Model Schools 9 (K9) \u2013 which offers schooling from Year One to Form Three \u2013 in the remote areas of Sabah, there is a lower number of children graduating. This in turn has a knock-on effect which means that as a result, only 12.7% of the rural workforce in Sabah had tertiary education qualifications in 2020. <\/p>\n\n\n\n Low education attainment and insufficient skillsets resulted in fewer Sabahans securing employment in better-paying, high-productivity and knowledge-intensive\/highly-skilled sectors. <\/p>\n\n\n\n According to the 2019 Household Income and Basic Amenities Survey Report, only 14.4% of Sabah\u2019s workforce are skilled workers. With most Sabahans having low-skilled jobs, median household income in rural areas is low: RM3,172 for Sabah as compared with the national average of RM3,828. <\/p>\n\n\n\n At the same time, due to an underdeveloped infrastructure, Sabah could not attract a sufficient critical mass of domestic direct investment (DDI) and foreign direct investment (FDI) to become a more industrialised and developed state. When there is a lack of a supportive ecosystem (i.e., the availability of local or home-grown technology, skilled talent, efficient supply chain and the necessary infrastructure), GDP growth is lower and, by extension, unemployment is higher. <\/p>\n\n\n\n With the lowest GDP growth (i.e., -9.5%) recorded compared to the rest of the nation in 2020, Sabah continues to record the highest unemployment rate in the country. <\/p>\n\n\n\n The unemployment rate in Sabah rose from 5.8% in 2019 to 8% in 2020 and 9% in the fourth quarter of 2021 (4Q21). Based on the statement from the Sabah Science, Technology and Innovation Minister Datuk Yakub Khan during the current state assembly sitting, there were 184,200 jobless people in 2021. <\/p>\n\n\n\n Instead of allocating extra expenditure for the installation of 5G networks, the Sabah state government should first re-negotiate with the federal government and ask for additional funding for basic infrastructure. <\/p>\n\n\n\n For example, there is a critical and urgent need for additional allocation of between RM200 to RM300 million to repair the badly damaged Mile 32 and Mile 28 of the Sandakan road in Telupid within Sandakan district. <\/p>\n\n\n\n Notwithstanding, Deputy Chief Minister of Sabah Datuk Seri Bung Moktar Radin indicated his plan to demolish the Sandakan road once the Pan-Borneo Highway is completed in two and a half years. <\/p>\n\n\n\n However, Sabahans might no longer be as patient in have to bear and endure the poor road conditions. <\/p>\n\n\n\n The state legislative assembly session on March 21 (Monday), 2022 went viral after Bung Moktar revealed budget constraints in repairing damaged roads. Many road users expressed their disappointment and complained about burst tyres and damaged cars arising from the recent flooding disaster in Telupid. <\/p>\n\n\n\n Hence, EMIR Research would like to suggest that the current Sabah state government re-evaluate its current infrastructure upgrading plans. <\/p>\n\n\n\n Following are some of the initiatives for the Sabah state government to look into: <\/p>\n\n\n\n When the Sabah state government re-shift its development priorities to reflect the urgent needs of Sabahans, they would be able to enjoy better access to basic infrastructure. In turn, this would also assist Sabah to expand its economic presence outside of the state. <\/p>\n\n\n\n Amanda Yeo is Research Analyst at EMIR Research, an independent think tank focused on strategic policy recommendations based on rigorous research.<\/em><\/p>\n<\/div><\/div>\n<\/div><\/div>\n